Fees and charges include Goods and Services Tax (GST).
Water supply
Service | Charge |
Upper Belmont Development Levy (per lot) |
$6,686.00 |
Water connection fee |
$100.00 |
Fee for use of water by builders on unmetered industrial and commercial sites |
$80.00 |
Ordinary supply class 2 water
Service | Charge |
Minimum charge |
Uniform Annual Charge |
Domestic water meter rental |
$75.00 |
Normal users per cubic metre
Service | Charge |
Up to 100,000 cubic metres |
$2.38 |
In excess of 100,000 cubic metres |
$1.71 |
Water supplied by hydrant
Service | Charge |
Per cubic metre |
$2.38 |
Minimum charge |
$35.00 |
Back flow prevention - annual inspection charge |
$180.00 |
Wastewater
Service | Charge |
Wastewater connection application fee |
$100.00 |
Wastewater connection fee |
Actual cost to approved contractors |
Trade Waste
Trade waste class | Consent charge | Consent + $165 if conditional consent required |
Class 1: high risk |
$1,640.00 |
$1,805.00 |
Class 2: moderate risk |
$825.00 |
$990.00 |
Class 3: low risk |
$460.00 |
$625.00 |
Class 4: minimal risk |
$245.00 |
$410.00 |
Class 5: minimal risk with low flow |
$125.00 |
N/A |
Application charge |
$95.00 |
|
Re-inspection charge |
$95.00 |
|
Late payment additional fee |
$95.00 |
|
Transfer additional fee |
$47.50 |
|
See the trade waste user charges.
Stormwater
Service | Charge |
Stormwater connection application fee |
$100.00 |
Stormwater connection fee |
Actual cost to approved contractors |
Application forms
Water supply connection or alteration form (PDF 50 KB)
Private connection to wastewater or stormwater drainage network form (PDF 50 KB)