Parking fines for overstaying
| Overstaying excess time | Charge |
| More than 30 minutes |
$12.00 |
| More than 1 hour |
$15.00 |
| More than 2 hours |
$30.00 |
| More than 4 hours |
$42.00 |
| More than 6 hours |
$57.00 |
Failure to display a valid pay and display ticket will result in a $40.00 charge.
Parking on a mobility car park without displaying a valid mobility pass card will result in a $150 charge.
Signboard hire costs
(Hire Fees are per week and include installation plus removal costs. All prices exclusive of GST)
| Signboard location | A side | B side |
| Victoria & Railway Ave intersection (Ewen Bridge) |
$160.00 |
N/A |
| Waione Street bridge, Seaview |
$130.00 |
$130.00 |
| Fairway Drive, Avalon |
$110.00 |
$110.00 |
| Cambridge Tce, Naenae |
$80.00 |
$80.00 |
| All four signboards |
$420.00 |
$260.00 |
Sign production costs
| Service | Charge per sign | A side set | B side set |
| Digital print on coreflute |
$150.00 |
$600.00 |
$450.00 |
Total pricing for hiring = weekly hire Fee + production costs per board + GST.
Roading fees and charges
| Subdivision inspection & approval charges | Charge |
| Boundary adjustment |
$132.30 |
| Additional lots/unit titles |
| 3.43% of total construction cost for one new lot reducing by 0.07% for each additional lot to 0.7% for 40 or more additional lots. This is the minimum fee irrespective of whether any construction work is necessary. |
$132.30 |
| Motor crossing | Standard charge | Admin / inspection charge |
| Concrete dished crossing/m2 |
$130.00 |
$72.00 |
| Extensions to existing concrete crossings/m2 |
$130.00 |
$72.00 |
| Installation of concrete dished crossing in conjunction with road reconstruction work/m2 |
$65.00 |
$72.00 |
| Concrete block crossing/pipe crossing/'Slot' type crossing/m2 |
$130.00 |
$72.00 |
| Deposit for privately installed crossing ($200 refunded upon satisfactory completion of crossing) |
$272.00 |
|
| Trench inspection charges | Charge |
| Engineer (per hour) |
$118.00 |
| Inspector (per hour) |
$102.00 |
Proposals, administration and monitoring on time basis.