Find out about the fees and charges for signage and roadworks in Lower Hutt.
There are four signboards located in Lower Hutt that can be hired out by the week. The weekly hire fees include installation and removal costs. Total price for hiring is weekly hire fee plus production costs plus GST.
All prices are exclusive of GST.
2021/2022 fees & charges
Signboard location | Side A hire per week | Side A production per booking | Side B Hire per week | Side B production per booking |
---|---|---|---|---|
Ewen Bridge | $140.00 | $160.00 | $140.00 | $160.00 |
Waione Street Bridge, Seaview | $140.00 | $160.00 | $100.00 | $160.00 |
Kennedy Good Bridge, Avalon | $140.00 | $160.00 | $100.00 | $160.00 |
Cambridge Terrace, Naenae | $100.00 | $160.00 | Currently Unavailable $100.00 | $160.00 |
All four signboards | $520.00 | $640.00 | $440.00 | $640.00 |
Subdivision inspection & approval charges | 2021/2022 Charge | 2022/2023 Charge |
---|---|---|
Boundary adjustment | $195.00 | $205.00 |
All processing or monitoring by engineer or administration | $175.00 per hour | $180.00 per hour |
All processing or monitoring by senior/principal engineer | $195.00 per hour | $205.00 per hour |
In accordance with Clause 6.5 Corridor Manager Cost Recovery in the National Code, Council is able to recover costs in administering and monitoring Corridor Access Requests (CAR) consent compliance.
Since 1 July 2015 Hutt City Council aligns itself with Upper Hutt City Council’s fees and charges for processing CAR. This includes charging a fee for texturizing seal coats where trenches are located within the carriageway.
Request type | 2021/2022 Charge | 2022/2023 Charge |
---|---|---|
Corridor Access Request - Minor Work (per CAR request) | $175.00 | $180.00 |
Corridor Access Request - Major Work (per CAR request) | $215.00 | $222.00 |
Corridor Access Request - Project Work (per CAR request) | $1,075.00 | $1107.00 |
Fee the texturizing seal coat of a trench in carriageway | $7.00/m2 | $7.21/m2 |
Re-inspection Fee | $200.00 per inspection | $206.00 per inspection |
Council installed motor crossing charges* | 2021/2022 charge | 2021/2022 Admin/inspection charge | 2022/2023 charge | 2022/2023 Admin/inspection charge |
---|---|---|---|---|
Concrete dished crossing per square metre | $200.00m2 | $160.00m2 | $206.00m2 | $165.00m2 |
Extensions to existing concrete crossings per square metre | $200.00m2 | $160.00m2 | $206.00m2 | $165.00m2 |
Installation of concrete dished crossing in conjunction with road reconstruction work per square metre | $80.00m2 | $160.00m2 | $83.00m2 | $165.00m2 |
Concrete block crossing/pipe crossing/'Slot' type crossing per square metre | $200.00m2 | $160.00m2 | $206.00m2 | $165.00m2 |
*Traffic management costs are additional and will be advised at the time of quotation.
Privately installed motor crossing charges | 2021/2022 charge | 2021/2022 Admin/inspection charge | 2022/2023 charge | 2022/2023 Admin/inspection charge |
---|---|---|---|---|
Deposit for privately installed crossing ($300 refunded upon satisfactory completion of crossing) | $300.00 | $200.00 | $309.00 | $206.00 |
Deposit for installation of a Heavy Duty or Extra Heavy Duty vehicle crossing ($500.00 refunded upon satisfactory completion of crossing) | $500.00 | $300.00 | $515.00 | $206.00 |